News

METPROM Selected as Developer of Design Documentation for Sulfuric Acid Neutralization-2 Project at Copper Plant (Norilsk)

PJSC MMC Norilsk Nickel signed a contract with METPROM for engineering surveys, inspection of existing structures and development of design documentation with the support in passing the Main Environmental Expert Review and Main State Expert Review for the Sulfuric Acid Neutralization-2 project, Copper Plant, Polar Division.
The project facilities include:
·      • Power-operated lime storage
·      • Lime milk preparation shop
·      • Effluent treatment facilities
·      • Sulfuric acid storage
·      • Ore stockyard
·      • Pumping station
·      • Pipeline rack

Obtaining a positive conclusion from GlavGosExpertiza (General Board of State Expert Review) is scheduled for Q3 2022.