Turnkey construction of a plant with a capacity of 500 thou tpa of cold and coated flats
Project
  • Feasibility study
  • Design of main production lines and infrastructure facilities with arrangement of process equipment;
  • Tenders, vendor selection and supply of production technology, main and auxiliary equipment that would ensure stable production of high-quality products in required quantities while minimizing costs and consumption of raw and other materials, replaceable equipment and utilities;
  • All types of civil and structural works for main production facilities and infrastructure, responsibility for deadlines and construction costs;
  • Training and education of personnel;
  • Commissioning and startup.
Composition of work
  • Feasibility study
  • Concept of design
  • General design
  • Site preparation works
  • Supply of main and auxiliary equipment
  • Installation of process equipment — 10,000 tons
  • Installation of steel structures — 12,500 tons
  • Construction of reinforced concrete structures — 70,500 m3
  • Excavation — 290,000 m3
  • Ground-surface pipelines (HDP) — 53,000 m
  • Small bore pipelines (<100 mm) — 3,000 m
  • Large bore pipelines (>100 mm) — 12,500 m
  • Installation of hydraulic system — 750 t
Scope of work
Over EUR 300 m
Investment volume
Swipe
Design capacity: 500 thou tpa of steel products, including:

  • hot-dip galvanized flats — 200 thou tpa

  • prepainted flats — 300 thou tpa
Performances
The main process equipment of TMZ includes: a push-pull pickling line, a two-stand reversing cold rolling mill, a continuous hot-dip galvanizing line, and a prepainting line.
Facility composition