© 2022 METPROM
En
JSC SUMZ
Customer
Sredneuralsk Copper Smelter
Facility
2013 — 2014
Timeframe
Construction of a mini-CHPP for power and heat supply to the life support system
Project
  • Excavation works
  • Arrangement of bored piles
  • Construction of foundations
  • Arrangement of monolithic floorings
  • Construction of the CHPP building frame
  • Installation of wall sandwich panels
  • Construction of the office and amenity building
  • Arrangement of outdoor plumbing systems
  • Fabrication and erection of steel structures
  • Installation of process equipment
  • Laying of process pipelines
  • Electric wiring
  • Installation of heating and ventilation systems
  • Commissioning
  • Landscaping
Composition of work