Customer
Balakovo Steel Factory
Facility
2013 — 2014
Timeframe
Construction of a 1 mtpa long product plant (EAF meltshop, section rolling shop, gas cleaning system)
Project
RUB 25 bn
Investment volume
Swipe
Design capacity is 1 mtpa of long products
Performances
METPROM specialists developed the engineering and design of the main lines and infrastructure facilities with process equipment arrangement (in total, 65 facilities); provided technical consulting services; prepared the feasibility study; developed design documentation, rendered support for the approval process with the state expert review bodies; developed detail design documentation; provided designer supervision services.
Composition of work
Installation of steel structures - 23,000 tons, at:
  • EAF meltshop
  • Rolling shop
  • Gas cleaning facilities
Scope of work
  • EAF meltshop.
  • Long product rolling shop
  • Common and infrastructure facilities