PAO Severstal
Customer
Cherepovets Steel Mill
Facility
2018 — 2020
Timeframe
Technical revamping of Continuous Pickling Line No. 4
Project
  • General design
  • A range of works for the shutdown period: dismantling of Process Line No.1 complete equipment and foundations, construction of foundations and erection of CPL No.4 complete equipment.
  • A range of works: dismantling of Process Line No.2 complete equipment and foundations, construction of railway tracks, ramps and the storage area for pickled hot-rolled coils.
Composition of work
Over RUB 4 bn
Investment volume
Swipe
  • Average daily production: 6,030 t
  • Design capacity: 2 mtpa of products
Performances
  • Dismantling of equipment and steel structures - 3,500 tons
  • Dismantling of reinforced concrete structures - 9,500 m3
  • Installation of process equipment - 3,000 tons
  • Installation of steel structures - 2,000 tons
  • Installation of reinforced concrete structures - 6,000 m3
  • Ground-surface pipelines (HDP) – 5,500 m
  • Small bore pipelines (<100 mm) – 2,500 m
  • Large bore pipelines (>100 mm) – 2,800 m
  • Electrical equipment - 70 pcs
  • Electrical cables - 192,000 m
  • Instrumentation - 30 pcs
  • Installation of hydraulic system - 350 tons
Scope of work