PAO Severstal
Customer
Cherepovets Steel Mill
Facility
2018 — 2020 гг.
Timeframe
Design of 3200 m3 Blast Furnace No.3 complex
Project
  • Design documentation
  • Detail design documentation
  • Designer supervision
Composition of work
Over RUB 34 bn
Investment volume
Swipe
Indicators:
  • Blast furnace volume 3290 m3
  • Average daily production: 7280 tpa
  • Design capacity: 2.6 mtpa of hot metal
  • State-of-the-art design solutions that provide for the specific furnace daily output of 2.5 t/m3 were implemented at this facility

State-of-the-art design solutions that provide for the specific daily output of 2.5 t/m3 were implemented at the blast furnace. Modern environmental protection technologies: highly efficient dedusting systems, a closed-loop water recirculation system, etc., were used for the project
Performances
  • Blast furnace proper;
  • Top arrangement with a four-column support system;
  • Casthouses No. 1 and No. 2;
  • Furnace control building;
  • Cyclone;
  • Elevator shaft with stairs;
  • Stove units;
  • Material handling system;;
  • Stockhouse;
  • Power and utility systems;
  • Dedusting system;
  • Supply ventilation system
Facility composition