© 2022 METPROM
En
PJSC MMC Norilsk Nickel
Customer
Polar Division. Copper Plant
Facility
2020 — 2022
Timeframe
Sulfuric Acid Neutralization No.2
Project
  • Feasibility study
  • Engineering surveys
  • Design documentation
Composition of work
  • Facilities:
  • Power-operated lime storage
  • Lime milk preparation shop
  • Effluent treatment facilities
  • Sulfuric acid storage
  • Ore stockyard
  • Pumping station
  • Pipeline rack
Facility composition
Over RUB 25 bn
Investment volume
Swipe