Design of Blast Furnace No.7 “Rossiyanka” complex 
   
 
METPROM specialists developed a feasibility study (design) for the revamping of NLMK's blast furnace shop with the construction of Blast Furnace No. 7 and developed detail design documentation for the main process unit, casthouse and GCP; METPROM also provided designer supervision services. 
   
 
 
 
 
 
 
Blast furnace volume: 4300 m3
 Design capacity: over 3.4 mtpa of hot metal
 Recovery co-gen plant capacity: 150 MW
The Blast Furnace No.7 "Rossiyanka" project employs most advanced green technologies – highly efficient dedusting systems, closed-loop water recirculation system, maximized recycling of BF off-gas to generate in-house electric power at the co-gen plant constructed as part of the BF complex. 
   
 
- METPROM was in charge of:
 -  Blast furnace cooling system;
 -  Industrial wiring of the BF, casthouse, stove unit, cyclone
 -  Casthouses No.1 and No.2;
 -  Construction of a runner system with covers;
 -  Ducts of the casthouse dedusting system;
 - Main and auxiliary casthouse equipment