NLMK
Customer
Novolipetsk Steel Plant
Facility
2019 — 2020
Timeframe
Rebuilding of Blast Furnace No.4 casthouse.
Project
  • Design documentation
  • Detail design documentation
  • Designer supervision
Composition of work
Over RUB 23 bn
Investment volume
Swipe
  • Blast furnace volume 2000 m3
  • Average daily production 5,850 tpd
  • Design capacity 2.1 mtpa of hot metal
Performances
METPROM was in charge of:
  • Revamping of casthouses No. 1 and No. 2;
  • Construction of a runner system with covers;
  • Ducts of the casthouse dedusting system;
  • Main and auxiliary casthouse equipment
Facility composition