MMK NOVOTRANS
Customer
Metallurgical machine-building complex in the Lipetsk region
Facility
2021 — 2024
Timeframe
Plant to produce 400,000 tpa of solid-rolled railway wheels
Project
  • Green Wheel concept: using best modern practices in industrial ecology
  • High-tech production — all production processes require minimum human assistance based on Industry 4.0 approach
  • Zero waste production — all metal waste is returned into the production process
  • Energy efficient production due to the furnace off-gas heat recovery
  • 250 thou tpa — processing of steel scrap and raw materials
  • 214 thou tpa — production of concast billets
  • 400 thou tpa — production of solid-rolled railway wheels
Performances
Swipe
  • Concept of design
  • Design documentation and detail design documentation
Composition of work
  • Scrap yard
  • EAF meltshop shop
  • Integrated gas cleaning plant
  • Water supply shop
  • Wheel rolling shop
  • Air separation plant
  • The complex area is 25 hectares
  • Built-up area — 100,000 m2
Facility composition
Over RUB 30 bn
Investment volume