© 2022 METPROM
Ru
About Us
Competences
Projects
News
Career
En
Download presentation (.pdf, 12,3 МB)
+7 (495) 229-56-40
metprom@metprom.net
Scholarship
Events
Contact Us
RU
© 2022 METPROM
About Us
Competences
Projects
News
Career
Download presentation (.pdf, 12,3 МB)
+7 (495) 229-56-40
metprom@metprom.net
Scholarship
Events
Contact Us
MMK NOVOTRANS
Customer
Metallurgical machine-building complex in the Lipetsk region
Facility
2021 — 2024
Timeframe
Plant to produce 400,000 tpa of solid-rolled railway wheels
Project
Green Wheel concept: using best modern practices in industrial ecology
High-tech production — all production processes require minimum human assistance based on Industry 4.0 approach
Zero waste production — all metal waste is returned into the production process
Energy efficient production due to the furnace off-gas heat recovery
250 thou tpa — processing of steel scrap and raw materials
214 thou tpa — production of concast billets
400 thou tpa — production of solid-rolled railway wheels
Performances
→
Swipe
←
Concept of design
Design documentation and detail design documentation
Composition of work
Scrap yard
EAF meltshop shop
Integrated gas cleaning plant
Water supply shop
Wheel rolling shop
Air separation plant
The complex area is 25 hectares
Built-up area — 100,000 m2
Facility composition
Over RUB 30 bn
Investment volume
Projects
→
MMK NOVOTRANS