Mechel Yakutugol
Customer
Neryungrinskoye coal deposit. Neryungrinskaya Washing Plant
Facility
2020
Timeframe
Overhaul of equipment and structural works at the Neryungrinskaya Washing Plant
Project
  • Dismantling of equipment and steel structures - 180 tons
  • Dismantling of pipelines - 650 running meters
  • Dismantling of lining - 500 m3
  • Installation of equipment and steel structures - 320 tons
  • Installation of pipelines - 810 running meters
  • Installation of lining - 200 m3
  • Heat insulation - 30 m2
Scope of work
Swipe
  • Repair of belt conveyors in the drying shop
  • Repair of vibrating dewatering screens supplied by Schenck
  • Repair of circulating water tanks
  • Repair of fire water tanks
  • Repair of sludge pipeline with shutoff valves
  • Replacement of magnetite collection tanks
  • Replacement of magnetite slurry chutes