Mechel PAO
Customer
Mechel Chelyabinsk Metallurgical Plant
Facility
2019 — 2020
Timeframe
Blast Furnace No.4 Casthouse dedusting system
Project
  • Design documentation
  • Detail design documentation
Composition of work
Installation of a casthouse dedusting system with air ducts
Facility composition
  • Blast furnace volume 1386 m3
  • Extracted air volume 515 thou m3/h
Performances