KUMZ
Customer
Kamensk-Uralsky Metallurgical Works
Facility
2016 — 2017
Timeframe
Construction of hot rolling, cold rolling and thermomechanical treatment shops
Project
  • Installation of process equipment - 3,200 tons
  • Installation of steel structures - 3,000 t
  • Small bore pipelines (<100 mm) - 10 m
  • Large bore pipelines (>100 mm) – 20 m
  • Electrical equipment - 5 pcs
  • Electrical cables - 7500 m
  • Installation of hydraulic system - 70 t
Scope of work
Swipe
A range of works for erection and commissioning of process equipment supplied by SMS Meer, installation of process pipelines, hydraulic pipelines, cabling and electrical equipment.
Composition of work