Blast Furnace No.1. 1st category overhaul. Conveyor system for burden materials.
Project
Detail design documentation
Composition of work
→
Swipe
←
Blast furnace volume 1510 m3
Design capacity: 1.5 mtpa of hot metal
Advanced solutions were used for the stockhouse design: replacement of a "scale car" with conveyor feeding of burden materials, screening of <5 mm sinter fines, increase in maximum throughput of burden materials up to the level that provides for the productivity of 4,500 t of hot metal/day