Industrial Metallurgical Holding
Customer
Tulachermet-Stal
Facility
2016 — 2017 гг.
Timeframe
Construction of a Casting and Rolling Complex with a capacity of up to 1.8 mtpa of rolled products
Project
  • Installation of process equipment - 20,000 tons
  • Installation of steel structures - 25,000 tons
  • Construction of reinforced concrete structures - 30,000 m3
  • Excavation - 290,000 m3
  • Installation of hydraulic system - 210 t
Scope of work
Over RUB 50 bn
Investment volume
Swipe
A range of works for the equipment and process pipeline erection in the BOF shop and rolling shop:
1. BOF
2. primary gas cleaning systems
3. off-gas heat recovery systems
4. hot strip mill with hydraulic equipment
5. hoisting mechanisms

Construction of warehouses for ferroalloys and bulk materials, gas cleaning facilities
Composition of work