Customer
Egyptian Iron and Steel Co
Facility
2017 — 2018
Timeframe
Turnkey revamping of the BOF Shop gas cleaning system
Project
  • Detail design documentation
  • Revamping and supply of the gas cleaning system, waste heat boiler, ID fan complete with an electric motor
Composition of work
Swipe
  • Gas flow 280 m3/h
  • Dust content downstream the BOF - 120 g/m3
  • Dust content after gas cleaning - less that 50 g/m3
  • Using a grease lubrication system for roller bearings of the ID fan and the motor and elimination of liquid lubrication made it possible to significantly reduce negative effect on the environment, as well as operating costs.
Perfomances
  • Installation of process equipment - 445 tons
  • Installation of steel structures - 240 t