EVRAZ ZSMK
Customer
West Siberian Iron and Steel Plant
Facility
2014
Timeframe
Pulverized coal injection systems for blast furnaces
Project
Over RUB 7 bn
Investment volume
Swipe
Production capacity: 160 tons of pulverized coal (PC) per hour or about 1.3 mtpa
Perfomances
  • Design documentation
  • Detail design documentation
Composition of work
METPROM specialists developed the engineering for the main production facilities and infrastructure, with process equipment arrangement; provided technical consulting services; prepared a feasibility study; developed design documentation, rendered support for the approval process with the state expert review bodies.
Scope of work
  1. Coal thaw shed.
  2. Static distribution units.
  3. Rotary car dumper.
  4. Conveyor galleries with transfer stations.
  5. Pedestrian overpasses.
  6. Open storage and silos for coal.
  7. Coarse crushing station.
  8. Turn-around conveyor station (Sicon belt).
  9. Pulverizing department.
  10. Fire extinguishing pump station for coal preparation, pulverizing department, sanitary effluents.
  11. Coal reloader.
  12. Transformer substation
Facility composition