Nizhny Tagil Iron and Steel Plant 
 Construction of a pulverized coal injection system for Blast Furnaces No. 3, 5, 6
  A PCI system is designed for pulverized coal injection into blast furnaces at a rate of up to 180 kg/t of hot metal; due to this technology it was possible to reduce the specific consumption of coke down to 300 kg/t of hot metal and fully avoid natural gas.
 
  METPROM specialists developed design documentation, rendered support for the approval process with the state expert review bodies; developed detail design documentation; provided designer supervision services. 
 - Coal thaw shed.
- Static distribution units.
- Rotary car dumper.
- Conveyor galleries with transfer stations.
- Pedestrian overpasses.
- Open storage and silos for coal.
- Coarse crushing station.
- Turn-around conveyor station (Sicon belt).
- Pulverizing department.
- Fire extinguishing pump station for coal preparation, pulverizing department, sanitary effluents.
- Coal reloader.
- Transformer substation