© 2022 METPROM
En
EVRAZ NTMK
Customer
Nizhny Tagil Iron and Steel Plant
Facility
2011 — 2013
Timeframe
Construction of a pulverized coal injection system for Blast Furnaces No. 3, 5, 6
Project
Over RUB 6 bn
Investment volume
Swipe
A PCI system is designed for pulverized coal injection into blast furnaces at a rate of up to 180 kg/t of hot metal; due to this technology it was possible to reduce the specific consumption of coke down to 300 kg/t of hot metal and fully avoid natural gas.
Performances
METPROM specialists developed design documentation, rendered support for the approval process with the state expert review bodies; developed detail design documentation; provided designer supervision services.
Composition of work
  • Coal thaw shed.
  • Static distribution units.
  • Rotary car dumper.
  • Conveyor galleries with transfer stations.
  • Pedestrian overpasses.
  • Open storage and silos for coal.
  • Coarse crushing station.
  • Turn-around conveyor station (Sicon belt).
  • Pulverizing department.
  • Fire extinguishing pump station for coal preparation, pulverizing department, sanitary effluents.
  • Coal reloader.
  • Transformer substation
Facility composition