EVRAZ NTMK
Customer
Nizhny Tagil Iron and Steel Plant
Facility
2019 — 2020 гг.
Timeframe
Blast Furnace No. 6 complex
Project
  • Concept of design
  • Engineering surveys
  • Design documentation
  • Detail design documentation
  • Designer supervision
  • Engineering, manufacture and supply of equipment for the casthouse and the stockyard dedusting system
Composition of work
USD 176 m
Investment volume
Swipe
  • Blast furnace volume 2200 m3
  • Specific output 3.26 t/m3 per day
  • Design capacity 2.55 mtpa of hot metal
  • The design solutions provide, in particular, for the highest specific daily output - 3.26 t/m3.
  • Average daily production: 7,183 tpd

The design solutions provide, in particular, for the highest specific daily output - 3.26 t/m3.
Performances
The following facilities of Blast Furnace No. 6 were revamped: the blast furnace proper with automated systems for top (BLT charging device) and bottom charging of raw materials, a top arrangement, two casthouses with fully covered main troughs and transport runners, a skip hoist, a BF control building; a shaftless stove unit; a stockhouse with discharge equipment for coke and sinter fines; gas cleaning systems (axial cyclone, scrubber, demister, BF off-gas pipelines, hydraulics and pump room); dedusting systems for casthouses and bottom charging; handling equipment, power and utilities, PCI system.
Facility composition