Esfahan Steel Company
Customer
Esfahan Steel Company
Facility
2013
Timeframe
Revamping of Blast Furnace No. 2.
Revamping of the top arrangement with a Bell-less Top Chute-type Charging Device (BLT) installation
Rebuilding of a skip bridge with modification of its geometry.
Проект
Swipe
  • Blast furnace volume after revamping: 2,270 m3
  • Average daily production: 4,000 tpd
  • Design capacity: 1.5 mtpa of hot metal
Performances
  • Design and equipment supply for the skip bridge
  • Design and equipment supply for all BLT components
  • Design of the cooling system, supply of the furnace shell
  • BLT device installation for 2000 m3 BF-2
Composition of work
  • Blast furnace with a top arrangement;
  • Skip bridge;
  • Casthouse;
  • Pump station for chemically treated water
Facility composition