© 2022 METPROM
En
ArcelorMittal
Customer
Arcelor Mittal Temirtau
Facility
2010
Timeframe
2nd category overhaul of Blast Furnace No.2
Project
Blast furnace volume after revamping: 2035 m3
Performances
Swipe
Detail design documentation
Composition of work
  • Main process unit (blast furnace proper with a top arrangement);
  • Casthouse;
  • Stoves;
  • Dust collector;
  • Stockhouse;
  • Fuel oil distribution room;
  • Main control pulpit;
  • Elevator;
  • Filtration station
Состав объектов