EVRAZ NTMK
Заказчик
Nizhny Tagil Iron and Steel Plant
Facility
2018 — 2020
Timeframe
Construction of a Top-Pressure Recovery Turbine (TRT) downstream Blast Furnace No. 7
Project
  • FEED study
  • Design documentation
  • Detail design documentation
Composition of work
USD 18 m
Investment volume
Swipe
Due to this system the company could increase its in-house power generation by 11.6 MW/hour (97,162 thou kWh/year) and reduce electricity procurement from external suppliers. BF gas flow though TRT is 460 thou Nm/hour
Perfomances