Lysva metallurgical plant

Title:   Design and construction of the sheet rolling complex for manufacturing cold rolled products and coated rolled products

Place:   Lysva, Perm Krai, Russia

Status:   The first stage of the project is completed.




The project includes two major stages:

  • Stage 1: construction of colour decorative coating line with Print technology with capacity of 110K tons of metal products per year.
  • Stage 2: construction of sheet rolling complex with cold rolling mill with capacity of 820K tons of metal products per year, including hot-dip galvanizing (400K tons) and colour coating (200K tons) lines.

Under conditions of operating production the color coating line with Print technology entered service in quarter III of 2016.