EVRAZ Consolidated West-Siberian Metallurgical Plant

Title:   Design and construction of the complex of pulverized coal injection into blast furnaces №1-3

Place:   Novokuznetsk, Kemerovo oblast, Russia

Status:   Entered operation in July 2014








The plant production capacity: 160 tons of pulverized coal fuel per hour.

The tall structure is designed and constructed for operation under conditions of high seismic activity.

The new construction in the territory of the operating enterprise

9 000 t of steel structures

14 000 m3 of piles and concrete works structures

5 000 t of process equipment